Show/Hide
EPA Alert: Increased Risk of Cyberattacks on Water & Wastewater Systems Read Full Advisory

Air Public Notices

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print

Dominion Energy - Chesterfield Power Station - Chesterfield County, VA

Purpose of notice: To seek public comment and announce a public hearing on a draft permit from the Department of Environmental Quality to limit air pollution from a facility in Chesterfield County, Virginia.

Public comment period: August 8 to October 8, 2025

Public hearing: SpringHill Suites Chester, 12301 Redwater Creek Road, Chester, on September 8, 2025, starting at 5:00 p.m. In order to provide opportunity for the maximum number of commentors, individual comment time will be limited. The hearing will last until the last oral comment has been presented, or at 9:30 p.m., whichever is earliest. If any commenters are unable to provide oral comment by the close of the hearing, written comments will be accepted for 30 days after the public hearing (see How to Comment section below).

Permit name: Prevention of Significant Deterioration Permit issued by DEQ pursuant to applicable air laws and regulations

Applicant name and registration number: Virginia Electric and Power Company; Registration #50396

Facility name and address: Chesterfield Power Station, 500 Coxendale Rd, Chesterfield, VA

Project description: Virginia Electric and Power Company, dba Dominion Energy, has applied for a permit to construct the Chesterfield Energy Reliability Center project. The existing facility is classified as a major source of air pollution located at 500 Coxendale Road, Chesterfield, VA. The maximum annual emissions of air pollutants from the facility are expected to be: 81.8 tons of PM, 153.9 tons of PM10, 153.9 tons of PM2.5, 825.3 tons of CO, 353.3 tons of NOx, 27.8 tons of SO2, 162.4 tons of VOC, 18.6 tons of H2SO4 and 2.2 million tons of CO2e. The expected effect on local air quality will be no significant deterioration.

HOW TO COMMENT: DEQ accepts comments by hand-delivery, e-mail, or postal mail. All comments must include the name, address or email address of the person commenting and must be received by DEQ during the comment period. DEQ also accepts written and oral comments at public hearings. To make a statement at a public hearing, write your name on a sign-up sheet available before the hearing. You may sign up only for yourself. The time allowed for each statement is set by the hearing officer.

Contact for public comments, document requests and additional information:  

Alison Sinclair
DEQ Piedmont Regional Office
4949 Cox Rd
Glen Allen, VA 23060
Phone: (804) 489-1008
E-mail: AirDivision1@deq.virginia.gov

The public may review the draft permit and application at the DEQ office named above by appointment; may request copies of the documents from the contact person listed above; or may download copies of the draft permit and engineering analysis from the links below.

Dominion Energy - Chesterfield Power Station - Draft Permit

Dominion Energy - Chesterfield Power Station - Draft Engineering Analysis

Return to full list >>

Public Notification Mailing List for Major Sources of Air Pollution

DEQ, as required by law and regulation, maintains a mailing list of persons who wish to be notified of the public comment period for certain types of air permits:

  • Permits for major sources of air pollution including Title V permits
  • Prevention of Significant Deterioration (PSD) permits
  • Non-attainment New Source Review Permits
  • Acid Rain Permits

These permits are subject to a mandatory public comment period prior to issuance. Any person who would like to be notified of these permit actions can complete and submit Form PPN to be added to the DEQ notification mailing list.

Individuals added to the list will receive the same public notice published in the newspaper, posted on the DEQ website and sent to EPA. Public comment periods are for a minimum of 30 days and a hearing may or may not be held at the end of the comment period depending on the type of permit and the comments received during the comment period. Contact Maya Whitaker with any questions. 

How to comment and/or request a public hearing for permits:

DEQ accepts comments and requests for public hearing by hand-delivery, e-mail, or postal mail. All comments and requests must be in writing and be received by DEQ during the comment period. Submittals must include the names, mailing addresses and telephone numbers of the commenter/requester and of all persons represented by the commenter/requester.

A request for public hearing must also include:

  1. The reason why a public hearing is requested.
  2. A brief, informal statement regarding the nature and extent of the interest of the requester or of those represented by the requestor, including how and to what extent such interest would be directly and adversely affected by the permit.
  3. Specific references, where possible, to terms and conditions of the permit with suggested revisions.

A public hearing may be held, including another comment period, if public response is significant, based on individual requests for public hearing, and there are substantial, disputed issues relevant to the permit or regulatory action.